A database of elements taken from Australian NTIS training packages.
| Unit | Name |
| BCCBM2001B | Strip pile heads |
| BCCBM3001B | Maintain concrete bridges |
| BCCBM3002B | Install pre-cast girders |
| BCCBM3003B | Install pre-cast parapets |
| BCCBM3004B | Operate a bridge inspection unit |
| BCCBM3005B | Install pre-cast concrete bridge decks |
| BCCBM3006B | Undertake concreting work on concrete bridges |
| BCCBM3007B | Construct formwork and falsework on concrete bridges |
| BCCBS2001B | Conduct tack coat spraying operations |
| BCCBS2002B | Hand spread asphalt |
| BCCBS2003B | Safely handle bituminous materials |
| BCCBS2004B | Conduct aggregate spreader box operations |
| BCCBS2005B | Roll aggregate in sprayed sealing operations |
| BCCBS2006B | Conduct pavement sweeping operations |
| BCCBS2007B | Take samples of materials used in road surfacing |
| BCCBS2008B | Conduct road maintenance operations |
| BCCBS3001B | Conduct profile planer operations |
| BCCBS3002B | Conduct paver screeding operations |
| BCCBS3003B | Conduct materials transfer vehicle operations |
| BCCBS3004B | Compact asphalt with rollers |
| BCCBS3005B | Conduct asphalt paver operations |
| BCCBS3006B | Conduct slurry sealing operations |
| BCCBS3007B | Conduct bitumen sprayer operations |
| BCCBS3008B | Load aggregate using a purpose built loader |
| BCCBS3009B | Conduct self propelled aggregate spreader operations |
| BCCBS3010B | Conduct patching operations |
| BCCBS3011B | Produce asphalt products |
| BCCBS3012B | Conduct bitumen tanker operations |
| BCCCM1001B | Follow OH&S policies & procedures |
| BCCCM1001C | Follow OH&S policies and procedures |
| BCCCM1002B | Conduct workplace communication |
| BCCCM1003B | Plan and organise work |
| BCCCM1004B | Carry out measurements and calculations |
| BCCCM1005B | Handle construction materials and safely dispose of non-toxic materials |
| BCCCM2001B | Use civil construction hand and power tools |
| BCCCM2002B | Use small plant and equipment |
| BCCCM2002C | Use small plant and equipment |
| BCCCM2003B | Read and interpret plans and specifications |
| BCCCM2004B | Drain and dewater site |
| BCCCM2005B | Carry out manual excavation |
| BCCCM2006B | Support plant operations |
| BCCCM2007B | Spread and compact materials manually |
| BCCCM2008B | Carry out basic levelling |
| BCCCM2009B | Work in confined spaces |
| BCCCM2010B | Install trench support |
| BCCCM2011B | Erect and dismantle temporary fencing and gates |
| BCCCM2012B | Carry out concrete work |
| BCCCM2013B | Control traffic with a stop-slow bat |
| BCCCM2013C | Control traffic with a stop-slow bat |
| BCCCM2014B | Identify, locate and protect underground services |
| BCCCM3001B | Construct and dismantle fences and gates |
| BCCCM3002B | Control construction site water table |
| BCCCM3003B | Implement traffic management plan |
| BCCCM3003C | Implement traffic management plan |
| BCCCM3004B | Maintain site records |
| BCCCM3005B | Carry out site based risk control processes |
| BCCFW3001B | Construct underpinning |
| BCCFW3002B | Install temporary and permanent rock anchors |
| BCCFW3003B | Install primary ground support |
| BCCFW3004B | Drive piles |
| BCCFW3005B | Bore cast in-situ piles |
| BCCPL3001B | Install water mains pipelines |
| BCCPL3002B | Install stormwater systems |
| BCCPL3003B | Install sewer pipelines |
| BCCPL3004B | Install pre-cast gully pits |
| BCCPL3005B | Install pre-cast access chambers |
| BCCPO3001B | Conduct backhoe/loader operations |
| BCCPO3001C | Conduct backhoe/loader operations |
| BCCPO3002B | Conduct dozer operations |
| BCCPO3003B | Conduct excavator operations |
| BCCPO3004B | Conduct wheeled front end loader operations |
| BCCPO3005B | Conduct tracked front end loader operations |
| BCCPO3006B | Conduct grader operations |
| BCCPO3007B | Conduct scraper operations |
| BCCPO3008B | Conduct skid steer loader operations |
| BCCPO3009B | Conduct pipe layer operations |
| BCCPO3010B | Conduct integrated tool carrier operations |
| BCCPO3011B | Conduct tractor operations |
| BCCPO3012B | Conduct tip truck operations |
| BCCPO3013B | Conduct roller operations |
| BCCPO3014B | Conduct water cart operations |
| BCCPO3015B | Conduct continuous bucket trencher operations |
| BCCPO3016B | Conduct dump truck operations |
| BCCPO3017B | Conduct self-propelled compactor operations |
| BCCPO3018B | Conduct paver operations |
| BCCPO3019B | Conduct stabiliser operations |
| BCCPO3020B | Load and unload plant |
| BCCPO3021B | Conduct telescopic materials handler operations |
| BCCRC2001B | Repair potholes |
| BCCRC2002B | Install signs |
| BCCRC2003B | Install sub-soil drainage |
| BCCRC2004B | Install and maintain roadside fixtures |
| BCCRC2005B | Install utility poles |
| BCCRC2006B | Install pre-cast concrete crash barriers |
| BCCRC2007B | Install noise barriers |
| BCCRC2008B | Lay pipes |
| BCCRC2009B | Lay reinforced concrete box culverts |
| BCCRC3001B | Maintain drainage systems |
| BCCRC3002B | Place and form concrete kerb, channel and fixtures |
| BCCRC3003B | Lay pavers |
| BCCRC3004B | Maintain sealed roads |
| BCCRC3005B | Conduct road construction paver screeding operations |
| BCCRC3006B | Conduct earthworks |
| BCCRC3007B | Conduct road pavement construction |
| BCCRM2001B | Escort mobile road marking operations |
| BCCRM2001C | Escort mobile road marking operations |
| BCCRM2002B | Handle and store road marking materials |
| BCCRM2003B | Conduct pedestrian road marking operations |
| BCCRM2004B | Prepare surface for road marking |
| BCCRM2005B | Conduct road marking measuring operations |
| BCCRM2006B | Conduct airless and atomised spraying operations |
| BCCRM2007B | Install raised pavement markers |
| BCCRM3001B | Conduct ride on road marking operations |
| BCCRM3002B | Conduct long line road marking operations |
| BCCRM3003B | Conduct thermo plastic road marking operations |
| BCCRM3003C | Conduct thermo plastic road marking operations |
| BCCTB2001B | Maintain timber bridges |
| BCCTB2002B | Apply bridge durability treatments |
| BCCTB2003B | Produce drawings and sketches |
| BCCTB3001B | Undertake visual inspection |
| BCCTB3002B | Install temporary support members |
| BCCTB3003B | Erect a temporary modular support system (bailey) on an existing bridge |
| BCCTB3004B | Install or replace sub-structure members |
| BCCTB3005B | Install or replace super-structure members |
| BCCTB3006B | Splice and connect timber members |
| BCCTB3007B | Assemble a temporary modular bridge |
| BCCTB3008B | Install or replace truss members |
| BCCTB3009B | Construct, maintain and remove coffer dams |
| BCCTB3010B | Construct specialised timber bridge deck systems |
| BCCTC3001B | Install tunnelling construction services |
| BCCTC3002B | Line tunnel |
| BCCTC3003B | Excavate tunnel by machine |
| BCCTC3004B | Muck out tunnel earthworks |
| BCCTC3005B | Construct portals |
| BCCTT3001B | Conduct fluid assisted directional boring |
| BCCTT3002B | Conduct impact moling, ramming and augering |
| BCCTT3003B | Control micro tunnelling and pipejacking |
| BCCTT3004B | Undertake on-line replacement for existing pipeline systems |
| BCCTT3005B | Undertake localised repair and sealing of existing pipeline systems |
| BCCTT3006B | Install cure in-place linings for existing pipeline systems |
| BCCTT3007B | Spray linings for existing pipeline systems |
| BCCTT3008B | Install close-fit linings for existing pipeline systems |
| BCCTT3009B | Install slip lining in existing pipeline systems |
| BCCTT3010B | Renovate large diameter pipes and chambers |
| BCGCM3001B | Operate elevated work platforms |
| DRTOGOF21B | Operate drilling fluids and mud pits |
| DRTOGON24B | Operate mud systems |
| FPIFGM069A | Trim and cross-cut felled trees (non-commercial/non-production) |
| FPIFGM111A | Fall trees manually - intermediate (non-commercial/non-production) |
| MNQ.OP/32.A | Carry out shot firing |
| THTGTM02A | Carry out grounds maintenance |
| UTGNGS301A | Construct and lay pipelines |